Search
239 results found.
Generation, distribution, and transmission rates after capped rates terminate or expire (§ 56-585.1)
2016A During the first six months of 2009, the Commission shall, after notice and opportunity for hearing, initiate proceedings to review the rates, terms and conditions for the provision of generation, distribution and transmission services of each inve . . .
Nondiscriminatory access to transmission and distribution system (§ 56-578)
2016A All distributors shall have the obligation to connect any retail customer, including those using distributed generation, located within its service territory to those facilities of the distributor that are used for delivery of retail electric energ . . .
Regional transmission entities (§ 56-579)
2016A As set forth in § 56-577, each incumbent electric utility owning, operating, controlling, or having an entitlement to transmission capacity shall join or establish a regional transmission entity, which hereafter may be referred to as “RTE, . . .
Construction of electrical transmission lines (§ 56-46.2)
2016The construction of all overhead electrical transmission lines shall adhere to the standards set forth in the National Electrical Safety Code. The Commission shall, upon receipt of a written complaint concerning the lack of compliance with these stan . . .
Unsolicited transmission of advertising materials by facsimile machine (§ 8.01-40.2)
2016A Any person aggrieved by the intentional electronic or telephonic transmission to a facsimile device of unsolicited advertising material may bring an action against the person responsible for the transmission to enjoin further violations and to reco . . .
Authority to equip and maintain television transmission and relay facilities (§ 15.2-1224)
2016A Any county may equip and maintain television transmission and relay facilities in areas which are so remote from regular transmission points of large television stations that television reception is impossible without special equipment and in which . . .
Commission to consider environmental, economic and improvements in service reliability factors in approving construction of electrical utility facilities; approval required for construction of certain electrical transmission lines; notice and hearings (§ 56-46.1)
2016A Whenever the Commission is required to approve the construction of any electrical utility facility, it shall give consideration to the effect of that facility on the environment and establish such conditions as may be desirable or necessary to mini . . .
Overhead high-potential power lines; surface transmission lines; electric wiring in surface buildings (§ 45.1-161.279)
2016A Overhead high-potential power lines shall be placed at least fifteen feet above the ground and twenty feet above driveways and haulage roads, shall be installed on insulators, and shall be supported and guarded to prevent contact with other circuit . . .
Measures to prevent transmission of disease (§ 35.1-10)
2016Nothing in this title applicable to restaurants shall prevent the Commissioner from taking whatever action he deems necessary to control the spread of preventable diseases as set forth in Title 32.1, including but not limited to the exclusion of empl . . .
Construction of transmission facilities (§ 67-1109)
2016All posts, poles, wires, cables, lines, pipelines, conduits, and other distribution facilities that shall be erected under any authority conferred by this chapter shall be so located as in no way to obstruct or interfere with public travel or the ord . . .