{"formats":[{"name":"JSON","format":"json","url":"\/downloads\/2026\/code-json\/56-265.20_1.json"},{"name":"Plain Text","format":"text","url":"\/downloads\/2026\/code-text\/56-265.20_1.txt"},{"name":"XML","format":"xml","url":"\/downloads\/2026\/code-xml\/56-265.20_1.xml"},{"name":"HTML","format":"html","url":"\/downloads\/2026\/code-html\/56-265.20_1.html"}],"law_id":370267,"edition_id":2,"section_id":370267,"structure_id":52732,"section_number":"56-265.20:1","catch_line":"Locating nonmetallic underground utility lines","history":"2002, c. 841.","full_text":"Notwithstanding the provisions of \u00a7 56-257.1, any plastic or other nonmetallic utility lines installed underground on and after July 1, 2002, shall be installed in such a manner as to be locatable by the operator for the purposes of this chapter.\n\n","order_by":null,"text":{"0":{"id":1381361,"text":"Notwithstanding the provisions of \u00a7 56-257.1, any plastic or other nonmetallic utility lines installed underground on and after July 1, 2002, shall be installed in such a manner as to be locatable by the operator for the purposes of this chapter.","type":"section","prefixes":[""],"prefix":"","entire_prefix":"","prefix_anchor":"","level":1}},"ancestry":[{"id":52732,"edition_id":2,"name":"Underground Utility Damage Prevention Act","identifier":"10.3","label":"chapter","depth":2,"order_by":16,"parent_id":52702,"metadata":{"child_laws":29,"child_structures":0},"date_created":"2026-08-02 03:03:48","date_modified":"2026-08-02 12:35:39","permalink":{"id":1476263,"object_type":"structure","relational_id":52732,"identifier":"10.3","token":"56\/10.3","url":"\/56\/10.3\/","edition_id":2,"permalink":0,"preferred":1}},{"id":52702,"edition_id":2,"name":"Public Service Companies","identifier":"56","label":"title","depth":1,"order_by":121,"parent_id":null,"metadata":{"child_laws":710,"child_structures":93},"date_created":"2026-08-02 03:03:25","date_modified":"2026-08-02 12:35:34","permalink":{"id":1475475,"object_type":"structure","relational_id":52702,"identifier":"56","token":"56","url":"\/56\/","edition_id":2,"permalink":0,"preferred":1}}],"structure_contents":[{"id":370253,"structure_id":52732,"section_number":"56-265.14","catch_line":"Short title","url":"\/56-265.14\/","token":"56\/10.3\/56-265.14","metadata":false},{"id":370254,"structure_id":52732,"section_number":"56-265.15","catch_line":"Definitions; calculation of time periods","url":"\/56-265.15\/","token":"56\/10.3\/56-265.15","metadata":{"court_decisions":{"0":{"name":"Chesapeake & Potomac Telephone Co. v. Properties One, Inc.","case_number":"Record 930110","citation":"439 S.E.2d 369","date":"1994-01-07","url":"https:\/\/www.courtlistener.com\/opinion\/1301658\/chesapeake-potomac-telephone-co-v-properties-one-inc\/","abstract":" .\u202f.\u202f. 439 S.E.2d 369 (1994) .\u202f.\u202f. ","court_html":"<abbr title=\"Supreme Court of Virginia\">SCV<\/abbr>"}}}},{"id":370255,"structure_id":52732,"section_number":"56-265.15:1","catch_line":" Exemptions; routine maintenance","url":"\/56-265.15_1\/","token":"56\/10.3\/56-265.15_1","metadata":false},{"id":370256,"structure_id":52732,"section_number":"56-265.16","catch_line":"Repealed","url":"\/56-265.16\/","token":"56\/10.3\/56-265.16","metadata":false},{"id":370257,"structure_id":52732,"section_number":"56-265.16:1","catch_line":"Operators to join notification centers; certification","url":"\/56-265.16_1\/","token":"56\/10.3\/56-265.16_1","metadata":false},{"id":370258,"structure_id":52732,"section_number":"56-265.17","catch_line":"Notification required prior to excavation or demolition; waiting periods; marking of proposed site","url":"\/56-265.17\/","token":"56\/10.3\/56-265.17","metadata":false},{"id":370259,"structure_id":52732,"section_number":"56-265.17:1","catch_line":"Notification and procedures for designers","url":"\/56-265.17_1\/","token":"56\/10.3\/56-265.17_1","metadata":false},{"id":370260,"structure_id":52732,"section_number":"56-265.17:2","catch_line":"Procedures for project owners","url":"\/56-265.17_2\/","token":"56\/10.3\/56-265.17_2","metadata":false},{"id":370261,"structure_id":52732,"section_number":"56-265.17:3","catch_line":"Procedures for operators in response to a designer notice","url":"\/56-265.17_3\/","token":"56\/10.3\/56-265.17_3","metadata":false},{"id":370262,"structure_id":52732,"section_number":"56-265.18","catch_line":"Notification requirements","url":"\/56-265.18\/","token":"56\/10.3\/56-265.18","metadata":false},{"id":370263,"structure_id":52732,"section_number":"56-265.19","catch_line":"Duties of operator; regulations","url":"\/56-265.19\/","token":"56\/10.3\/56-265.19","metadata":false},{"id":370264,"structure_id":52732,"section_number":"56-265.19:1","catch_line":"Private sewer laterals and sewer system laterals","url":"\/56-265.19_1\/","token":"56\/10.3\/56-265.19_1","metadata":false},{"id":370266,"structure_id":52732,"section_number":"56-265.20","catch_line":"Repealed","url":"\/56-265.20\/","token":"56\/10.3\/56-265.20","metadata":false},{"id":370267,"structure_id":52732,"section_number":"56-265.20:1","catch_line":"Locating nonmetallic underground utility lines","url":"\/56-265.20_1\/","token":"56\/10.3\/56-265.20_1","metadata":false},{"id":370268,"structure_id":52732,"section_number":"56-265.21","catch_line":"Marking by color","url":"\/56-265.21\/","token":"56\/10.3\/56-265.21","metadata":false},{"id":370269,"structure_id":52732,"section_number":"56-265.22","catch_line":"Duties of notification center upon notification by person intending to excavate; record of notification made by telephone required","url":"\/56-265.22\/","token":"56\/10.3\/56-265.22","metadata":false},{"id":370270,"structure_id":52732,"section_number":"56-265.22:1","catch_line":"Meetings between excavators and operators","url":"\/56-265.22_1\/","token":"56\/10.3\/56-265.22_1","metadata":false},{"id":370271,"structure_id":52732,"section_number":"56-265.23","catch_line":"Exemption for roadway maintenance operations by the Virginia Department of Transportation and certain counties, cities, and towns","url":"\/56-265.23\/","token":"56\/10.3\/56-265.23","metadata":false},{"id":370272,"structure_id":52732,"section_number":"56-265.24","catch_line":"Duties of excavator","url":"\/56-265.24\/","token":"56\/10.3\/56-265.24","metadata":false},{"id":370273,"structure_id":52732,"section_number":"56-265.24:1","catch_line":"Request to cease operation; immediate threat; penalty","url":"\/56-265.24_1\/","token":"56\/10.3\/56-265.24_1","metadata":false},{"id":370274,"structure_id":52732,"section_number":"56-265.25","catch_line":"Liability of operator and excavator; penalties","url":"\/56-265.25\/","token":"56\/10.3\/56-265.25","metadata":false},{"id":370275,"structure_id":52732,"section_number":"56-265.26","catch_line":"Repealed","url":"\/56-265.26\/","token":"56\/10.3\/56-265.26","metadata":false},{"id":370276,"structure_id":52732,"section_number":"56-265.26:1","catch_line":"Utility line depth requirement","url":"\/56-265.26_1\/","token":"56\/10.3\/56-265.26_1","metadata":false},{"id":370277,"structure_id":52732,"section_number":"56-265.27","catch_line":"Repealed","url":"\/56-265.27\/","token":"56\/10.3\/56-265.27","metadata":false},{"id":370278,"structure_id":52732,"section_number":"56-265.28","catch_line":"Sovereign immunity","url":"\/56-265.28\/","token":"56\/10.3\/56-265.28","metadata":false},{"id":370279,"structure_id":52732,"section_number":"56-265.29","catch_line":"Other similar laws","url":"\/56-265.29\/","token":"56\/10.3\/56-265.29","metadata":false},{"id":370282,"structure_id":52732,"section_number":"56-265.30","catch_line":"Authority of the State Corporation Commission","url":"\/56-265.30\/","token":"56\/10.3\/56-265.30","metadata":false},{"id":370283,"structure_id":52732,"section_number":"56-265.31","catch_line":"Commission to establish advisory committee","url":"\/56-265.31\/","token":"56\/10.3\/56-265.31","metadata":false},{"id":370284,"structure_id":52732,"section_number":"56-265.32","catch_line":"Commission to impose civil penalties for certain violations; establishment of Underground Utility Damage Prevention Special Fund","url":"\/56-265.32\/","token":"56\/10.3\/56-265.32","metadata":false}],"previous_section":{"id":370266,"structure_id":52732,"section_number":"56-265.20","catch_line":"Repealed","url":"\/56-265.20\/","token":"56\/10.3\/56-265.20","metadata":false},"next_section":{"id":370268,"structure_id":52732,"section_number":"56-265.21","catch_line":"Marking by color","url":"\/56-265.21\/","token":"56\/10.3\/56-265.21","metadata":false},"metadata":false,"official_url":"https:\/\/law.lis.virginia.gov\/vacode\/56-265.20:1\/","history_text":"<p>This law was first created in 2002. The record of its establishment is cataloged in chapter <a href=\"https:\/\/legacylis.virginia.gov\/cgi-bin\/legp604.exe?021+ful+CHAP0841\">841<\/a> of that year\u2019s edition of \u201cActs of Assembly,\u201d the annual state publication listing all changes made to the Code of Virginia in that year.<\/p>","references":false,"refers_to":[{"id":370217,"section_number":"56-257.1","catch_line":"Means of locating nonmetallic underground conduits","order_by":null,"url":"\/56-257.1\/"}],"permalink":{"id":1476317,"object_type":"law","relational_id":370267,"identifier":"56-265.20:1","token":"56\/10.3\/56-265.20_1","url":"\/56-265.20_1\/","edition_id":2,"permalink":0,"preferred":1},"url":"\/56-265.20_1\/","token":"56\/10.3\/56-265.20_1","dublin_core":{"Title":"Locating nonmetallic underground utility lines","Type":"Text","Format":"text\/html","Identifier":"\u00a7 56-265.20:1","Relation":"Code of Virginia"},"html":"\n\t\t\t\t\t\t<section><p>Notwithstanding the provisions of \u00a7&nbsp;<a class=\"law\" title=\"Means of locating nonmetallic underground conduits\" href=\"\/56-257.1\/\">56-257.1<\/a>, any plastic or other nonmetallic utility lines installed underground on and after July 1, 2002, shall be installed in such a manner as to be locatable by the operator for the purposes of this chapter.<\/p><\/section>","plain_text":"                                 CODE OF VIRGINIA\n\nLOCATING NONMETALLIC UNDERGROUND UTILITY LINES (\u00a7 56-265.20:1)\n\nNotwithstanding the provisions of \u00a7 56-257.1, any plastic or other nonmetallic\nutility lines installed underground on and after July 1, 2002, shall be\ninstalled in such a manner as to be locatable by the operator for the purposes\nof this chapter.\n\nHISTORY: 2002, c. 841.","edition":{"id":2,"name":"2026","slug":"2026","date_created":"2026-07-16 18:40:23","date_modified":"2026-08-02 15:14:36","current":1,"order_by":2,"last_import":"2026-08-02 12:37:30"}}