<?xml version="1.0"?>
<law><site_title>Virginia Decoded</site_title><site_url>https://vacode.org</site_url><law_id>364279</law_id><section_number>45.2-2113</section_number><catch_line> Plugging</catch_line><edition url="https://vacode.org/2026/" slug="2026" current="TRUE" last_updated="2026-08-02">2026</edition><structure><unit label="title" level="1" order_by="99" identifier="45.2">Mines, Minerals, and Energy</unit><unit label="subtitle" level="2" order_by="5" identifier="V">Other Sources of Energy; Energy Policy</unit><unit label="chapter" level="3" order_by="5" identifier="21">Nuclear Energy</unit><unit label="article" level="4" order_by="3" identifier="3">Exploration for Uranium Ore</unit></structure><text>
						<section><p>The plugging of an exploration hole shall be as follows:</p></section>
						<section id="1"><p><span class="prefix-number">1.</span> Each exploration hole shall be adequately plugged with cement from the bottom of the hole upward to a point three feet below plow depth. The remainder of the hole between the top of the plug and the surface shall be filled with cuttings or nontoxic <span class="dictionary">material</span>. <a id="paragraph-1357111" class="section-permalink" href="https://vacode.org/45.2-2113/#1"><i class="fa fa-link"/></a></p></section>
						<section id="2"><p><span class="prefix-number">2.</span> If multiple aquifers alternating <span class="dictionary">usable quality water</span> and saltwater zones, or other conditions determined by the <span class="dictionary">Director</span> to be potentially deleterious to surface water or groundwater are encountered, the conditions shall be isolated immediately by cement plugs. Each hole shall be plugged with cement to prevent water from flowing into or out of the hole or mixing within the hole. The length of the plug shall be determined by the <span class="dictionary">Director</span> on the basis of available data on the specific site. <a id="paragraph-1357112" class="section-permalink" href="https://vacode.org/45.2-2113/#2"><i class="fa fa-link"/></a></p></section>
						<section id="3"><p><span class="prefix-number">3.</span> Each exploration hole shall be plugged as soon as reasonably practical after drilling, unless multiple aquifers are encountered. <a id="paragraph-1357113" class="section-permalink" href="https://vacode.org/45.2-2113/#3"><i class="fa fa-link"/></a></p></section>
						<section id="4"><p><span class="prefix-number">4.</span> Alternative plugging procedures and <span class="dictionary">materials</span> may be utilized if the applicant demonstrates to the <span class="dictionary">Director</span>&#x2019;s satisfaction that the alternatives will protect groundwater and comply with the provisions of this article. In the event that a hole is more suitably plugged with a nonporous <span class="dictionary">material</span> other than cement, the <span class="dictionary">material</span> shall have characteristics at least equal to cement. <a id="paragraph-1357114" class="section-permalink" href="https://vacode.org/45.2-2113/#4"><i class="fa fa-link"/></a></p></section>
						<section id="5"><p><span class="prefix-number">5.</span> In the event that an exploration hole is to remain unplugged pursuant to the provisions of &#xA7; <a class="law" title=" Developing an exploration hole as a water well" href="/45.2-2114/">45.2-2114</a>, the procedure contained in subdivision 2, if applicable, shall be applied and the exploration hole shall be plugged to the extent required by that subdivision. <a id="paragraph-1357115" class="section-permalink" href="https://vacode.org/45.2-2113/#5"><i class="fa fa-link"/></a></p></section></text><history>1982, c. 269, &#xA7; 45.1-277; 2021, Sp. Sess. I, c. 387.</history><metadata></metadata></law>
