<?xml version="1.0"?>
<law><site_title>Virginia Decoded</site_title><site_url>https://vacode.org</site_url><law_id>372887</law_id><section_number>59.1-284.29</section_number><catch_line>Advanced Shipbuilding Production Facility Grant Program</catch_line><edition url="https://vacode.org/2026/" slug="2026" current="TRUE" last_updated="2026-08-02">2026</edition><structure><unit label="title" level="1" order_by="127" identifier="59.1">Trade and Commerce</unit><unit label="chapter" level="2" order_by="14" identifier="22.10">Advanced Shipbuilding Production Facility Grant Program</unit></structure><text>
						<section id="A"><p><span class="prefix-number">A.</span> As used in this section:
			&#x201C;<span class="dictionary">Advanced shipbuilding</span>&#x201D; means (i) the manufacture, construction, assembly, overhaul, repair, and testing of nuclear vessels and submarines for the United States Navy; (ii) the design or development of nuclear vessels and submarines for the United States Navy; or (iii) the manufacturing activities of a private company described under 2007 index number 336611 of the North American Industry Classification System.<br/><br/>			&#x201C;<span class="dictionary">Capital investment</span>&#x201D; means an investment in real property, tangible personal property, or both, within the <span class="dictionary">eligible city</span>.<br/><br/>			&#x201C;<span class="dictionary">Eligible city</span>&#x201D; means the City of Newport News or its industrial development authority.<br/><br/>			&#x201C;<span class="dictionary">Foundry</span>&#x201D; means a facility and equipment used to cast metal components used in <span class="dictionary">advanced shipbuilding</span>.<br/><br/>			&#x201C;<span class="dictionary">Grant</span>&#x201D; means the <span class="dictionary">advanced shipbuilding</span> production facility <span class="dictionary">grant</span> as described in this section.<br/><br/>			&#x201C;<span class="dictionary">Memorandum of understanding</span>&#x201D; means a performance agreement entered into on or before August 31, 2016, among a <span class="dictionary">qualified shipbuilder</span>, the Commonwealth, and others as appropriate, such as the <span class="dictionary">eligible city</span>, setting forth the requirements for <span class="dictionary">capital investment</span> and the creation of <span class="dictionary">new full-time jobs</span> that will make the <span class="dictionary">qualified shipbuilder</span> eligible for a <span class="dictionary">grant</span> under this section.<br/><br/>			&#x201C;<span class="dictionary">New full-time job</span>&#x201D; means employment of an indefinite duration in an <span class="dictionary">eligible city</span>, and engaged in the construction of a class of vessel or submarine not being built in that <span class="dictionary">eligible city</span> prior to January 1, 2016, for which the average annual wage is at least equal to the prevailing average annual wage in that <span class="dictionary">eligible city</span> and for which the standard fringe benefits are paid by the <span class="dictionary">qualified shipbuilder</span>, requiring a minimum of either (i) 35 hours of an employee&#x2019;s time per week for the entire <span class="dictionary">normal year</span> of such <span class="dictionary">qualified shipbuilder</span>&#x2019;s operations, which &#x201C;<span class="dictionary">normal year</span>&#x201D; must consist of at least 48 weeks, or (ii) 1,680 hours per year. Seasonal or temporary positions and positions created when a job function is shifted from an existing location in the Commonwealth shall not qualify as <span class="dictionary">new full-time jobs</span> under this section. Other positions, which may or may not be of indefinite duration, including supplemental employees of affiliates, subsidiaries, joint ventures, contractors, or subcontractors of the <span class="dictionary">qualified shipbuilder</span>, may be considered <span class="dictionary">new full-time jobs</span> if designated as such in the <span class="dictionary">memorandum of understanding</span> between such <span class="dictionary">qualified shipbuilder</span>, the Commonwealth, and others.<br/><br/>			&#x201C;<span class="dictionary">New production facility</span>&#x201D; means a facility or equipment that, pursuant to a <span class="dictionary">memorandum of understanding</span> with the <span class="dictionary">Secretary</span>, is constructed or purchased after January 1, 2016, and operated by the <span class="dictionary">qualified shipbuilder</span> for use in the construction of or manufacture of components for a class of nuclear vessels or submarines not being built in that <span class="dictionary">eligible city</span> as of January 1, 2016. Such <span class="dictionary">new production facility</span> may be owned by the <span class="dictionary">qualified shipbuilder</span> or may be operated by the <span class="dictionary">qualified shipbuilder</span> through a lease agreement with the <span class="dictionary">eligible city</span> or a local industrial development authority.<br/><br/>			&#x201C;<span class="dictionary">Qualified shipbuilder</span>&#x201D; means a shipbuilder located in an <span class="dictionary">eligible city</span> that (i) makes a new <span class="dictionary">capital investment</span> of at least $750 million from January 1, 2015, through December 31, 2020, related to <span class="dictionary">advanced shipbuilding</span> in an <span class="dictionary">eligible city</span>; (ii) creates at least 1,000 <span class="dictionary">new full-time jobs</span> in an <span class="dictionary">eligible city</span> for <span class="dictionary">advanced shipbuilding</span> or activities ancillary to or supportive of <span class="dictionary">advanced shipbuilding</span>; and (iii) builds a <span class="dictionary">new production facility</span>.<br/><br/>			&#x201C;<span class="dictionary">Secretary</span>&#x201D; means the <span class="dictionary">Secretary</span> of Commerce and Trade or his designee. <a id="paragraph-1390681" class="section-permalink" href="https://vacode.org/59.1-284.29/#A"><i class="fa fa-link"/></a></p></section>
						<section id="B"><p><span class="prefix-number">B.</span> Any <span class="dictionary">qualified shipbuilder</span> located in an <span class="dictionary">eligible city</span> or the <span class="dictionary">eligible city</span> shall be eligible to receive a <span class="dictionary">grant</span> each fiscal year beginning with the Commonwealth&#x2019;s fiscal year starting on July 1, 2020, and ending with the Commonwealth&#x2019;s fiscal year starting on July 1, 2024, unless such time frame is extended in accordance with subsection C or D. The <span class="dictionary">grants</span> under this section (i) shall be paid, subject to appropriation by the General Assembly, from the fund entitled the <span class="dictionary">Advanced Shipbuilding</span> Production Facility <span class="dictionary">Grant</span> Fund established in subsection G; (ii) shall not exceed $40 million in the aggregate; (iii) shall be paid to a <span class="dictionary">qualified shipbuilder</span> or <span class="dictionary">eligible city</span> during each fiscal year contingent upon the <span class="dictionary">qualified shipbuilder</span>&#x2019;s meeting the requirements for the aggregate of (a) number of <span class="dictionary">new full-time jobs</span> created and the substantial retention of the same and (b) amount of the <span class="dictionary">capital investment</span> made, as set forth in the <span class="dictionary">memorandum of understanding</span>; and (iv) shall be expended by the <span class="dictionary">qualified shipbuilder</span> or the <span class="dictionary">eligible city</span> on the capital or lease cost of a <span class="dictionary">new production facility</span> or a new or existing <span class="dictionary">foundry</span>. <a id="paragraph-1390682" class="section-permalink" href="https://vacode.org/59.1-284.29/#B"><i class="fa fa-link"/></a></p></section>
						<section id="B1" class="indent-1"><p><span class="prefix-number">1.</span> The amount of the <span class="dictionary">grant</span> to be paid in each fiscal year shall be conditional upon the <span class="dictionary">qualified shipbuilder</span>&#x2019;s meeting the requirements for (i) the aggregate number of <span class="dictionary">new full-time jobs</span> created and the substantial retention of the same throughout the calendar year that immediately precedes the beginning of such fiscal year and (ii) the aggregate amount of the <span class="dictionary">capital investment</span> made as of the last day of the calendar year that immediately precedes the beginning of such fiscal year. If the <span class="dictionary">qualified shipbuilder</span> has not fully met the <span class="dictionary">grant</span> requirements by December 31, 2020, the period of eligibility may be extended for up to three years, provided that the <span class="dictionary">grants</span> in any given fiscal year shall not exceed $8 million, plus any amounts deferred in accordance with subsection C or D. <a id="paragraph-1390683" class="section-permalink" href="https://vacode.org/59.1-284.29/#B1"><i class="fa fa-link"/></a></p></section>
						<section id="B2" class="indent-1"><p><span class="prefix-number">2.</span> The aggregate amount of <span class="dictionary">grants</span> that may be awarded in a particular fiscal year shall not exceed the following:
				a. $8 million for the Commonwealth&#x2019;s fiscal year beginning July 1, 2020;<br/><br/>				b. $16 million, less the total amount of <span class="dictionary">grants</span> previously awarded pursuant to this subsection, for the Commonwealth&#x2019;s fiscal year beginning July 1, 2021;<br/><br/>				c. $24 million, less the total amount of <span class="dictionary">grants</span> previously awarded pursuant to this subsection, for the Commonwealth&#x2019;s fiscal year beginning July 1, 2022;<br/><br/>				d. $32 million, less the total amount of <span class="dictionary">grants</span> previously awarded pursuant to this subsection, for the Commonwealth&#x2019;s fiscal year beginning July 1, 2023; and<br/><br/>				e. $40 million, less the total amount of <span class="dictionary">grants</span> previously awarded pursuant to this subsection, for the Commonwealth&#x2019;s fiscal year beginning July 1, 2024. <a id="paragraph-1390684" class="section-permalink" href="https://vacode.org/59.1-284.29/#B2"><i class="fa fa-link"/></a></p></section>
						<section id="C"><p><span class="prefix-number">C.</span> Any <span class="dictionary">qualified shipbuilder</span> or <span class="dictionary">eligible city</span> applying for a <span class="dictionary">grant</span> under this section shall provide <span class="dictionary">evidence</span>, satisfactory to the <span class="dictionary">Secretary</span>, of (i) the aggregate number of <span class="dictionary">new full-time jobs</span> created and the substantial retention of the same throughout the calendar year that immediately precedes the beginning of the fiscal year in which the <span class="dictionary">grant</span> is to be paid and (ii) the aggregate amount of the <span class="dictionary">capital investment</span> made as of the last day of the calendar year that immediately precedes the beginning of the fiscal year in which the <span class="dictionary">grant</span> is to be paid. The application and <span class="dictionary">evidence</span> shall be filed with the <span class="dictionary">Secretary</span> in person or by mail no later than April 1 each year following the calendar year in which the <span class="dictionary">qualified shipbuilder</span> meets such aggregate <span class="dictionary">new full-time job</span> requirements and aggregate <span class="dictionary">capital investments</span>. Failure to meet the filing deadline shall result in a deferral of a scheduled <span class="dictionary">grant</span> payment set forth in subsection B. For filings by mail, the postmark cancellation shall govern the date of the filing determination. <a id="paragraph-1390685" class="section-permalink" href="https://vacode.org/59.1-284.29/#C"><i class="fa fa-link"/></a></p></section>
						<section id="D"><p><span class="prefix-number">D.</span> The <span class="dictionary">memorandum of understanding</span> may provide that if a <span class="dictionary">grant</span> payment has been deferred for any reason, including the initial failure to meet the aggregate <span class="dictionary">capital investment</span> or the aggregate <span class="dictionary">new full-time job</span> requirements set forth in the <span class="dictionary">memorandum of understanding</span> or the occurrence of any substantial reduction in such <span class="dictionary">new full-time job</span> requirements after such requirements have been met but before the <span class="dictionary">grant</span> payment has been made, payment in a subsequent fiscal year for which such requirements have been met for the immediately preceding calendar year shall include both the deferred payment and the scheduled <span class="dictionary">grant</span> payment as provided in subsection B or that a proportional payment, based on the proportional share of the required additional full-time jobs, be made. <a id="paragraph-1390686" class="section-permalink" href="https://vacode.org/59.1-284.29/#D"><i class="fa fa-link"/></a></p></section>
						<section id="E"><p><span class="prefix-number">E.</span> The <span class="dictionary">memorandum of understanding</span> may also provide that a shipbuilder or <span class="dictionary">eligible city</span> that has qualified for and received <span class="dictionary">grants</span> under &#xA7; <a class="law" title="Advanced Shipbuilding Training Facility Grant Program; eligible city" href="/59.1-284.23/">59.1-284.23</a> may qualify for up to a separate and additional $6 million in one or more <span class="dictionary">grants</span> payable after July 1, 2016, but before July 1, 2022, to be used in the construction, lease, expansion, or renovation of a <span class="dictionary">foundry</span> in the <span class="dictionary">eligible city</span>. The <span class="dictionary">memorandum of understanding</span> shall require that the total amount of <span class="dictionary">grants</span> received pursuant to this subsection shall not exceed 25 percent of the total cost of improvements needed to meet standards for making castings for the construction of a class of vessel or submarine not being built in that <span class="dictionary">eligible city</span> prior to January 1, 2016, and that those standards are subsequently met. The <span class="dictionary">memorandum of understanding</span> may also set forth requirements for certain employment levels at the <span class="dictionary">foundry</span>. For clarification, such <span class="dictionary">grants</span> are not included in and shall not be subject to the overall limitation of the aggregate <span class="dictionary">grant</span> amount set forth in subsection B. <a id="paragraph-1390687" class="section-permalink" href="https://vacode.org/59.1-284.29/#E"><i class="fa fa-link"/></a></p></section>
						<section id="F"><p><span class="prefix-number">F.</span> As a condition of receipt of a <span class="dictionary">grant</span>, a <span class="dictionary">qualified shipbuilder</span> shall make available to the <span class="dictionary">Secretary</span> or his designee for inspection upon his request relevant and applicable documents to determine whether the <span class="dictionary">qualified shipbuilder</span> has met the requirements for the receipt of <span class="dictionary">grants</span> as set forth in this section and subject to the <span class="dictionary">memorandum of understanding</span>. The Comptroller shall not draw any warrants to <span class="dictionary">issue</span> checks for the <span class="dictionary">grant</span> program under this section without a specific appropriation for the same. All such documents appropriately identified by the <span class="dictionary">qualified shipbuilder</span> shall be considered confidential and proprietary. <a id="paragraph-1390688" class="section-permalink" href="https://vacode.org/59.1-284.29/#F"><i class="fa fa-link"/></a></p></section>
						<section id="G"><p><span class="prefix-number">G.</span> There is hereby created in the state treasury a special nonreverting fund to be known as the <span class="dictionary">Advanced Shipbuilding</span> Production Facility <span class="dictionary">Grant</span> Fund (the Fund). The Fund shall be established on the books of the Comptroller. Interest earned on moneys in the Fund shall remain in the Fund and be credited to it. Any moneys remaining in the Fund, including interest thereon, at the end of each fiscal year shall not revert to the general fund but shall remain in the Fund. Moneys in the Fund shall be used for the purposes stated in this section. <a id="paragraph-1390689" class="section-permalink" href="https://vacode.org/59.1-284.29/#G"><i class="fa fa-link"/></a></p></section></text><history>2016, c. 723; 2019, cc. 36, 114.</history><metadata></metadata></law>
