<?xml version="1.0"?>
<law><site_title>Virginia Decoded</site_title><site_url>https://vacode.org</site_url><law_id>375021</law_id><section_number>62.1-44.15:5.2</section_number><catch_line>General permits for ready-mix concrete plant discharges</catch_line><edition url="https://vacode.org/2026/" slug="2026" current="TRUE" last_updated="2026-08-02">2026</edition><structure><unit label="title" level="1" order_by="132" identifier="62.1">Waters of the State, Ports and Harbors</unit><unit label="chapter" level="2" order_by="6" identifier="3.1">State Water Control Law</unit><unit label="article" level="3" order_by="2" identifier="2">Control Board Generally</unit></structure><text>
						<section><p>Any general permit issued by the <span class="dictionary">Board</span> for discharges of stormwater and process wastewater from industrial activities associated with the manufacture of ready-mix concrete shall apply to both permanent and portable plants. The general permit may include a requirement that settling basins for the treatment and control of process wastewater and commingled stormwater be lined with concrete or other impermeable <span class="dictionary">materials</span> for settling basins constructed on or before February 1, 1998, and shall include such a requirement for all settling basins constructed on or after February 2, 1998.</p></section></text><history>1998, c. 28.</history><metadata></metadata></law>
